Based on a technical and economic analysis of the situation, Durpro proposed a multi-stage water treatment system that would recover the permeate from the MBR (membrane bioreactor) for use in the cooling tunnel.
Presentation of a filtration system equipped with three Hi-Flow membranes from Suez. Offering a filtration flow rate up to 900 liters per minute and removing contaminants larger than 5 microns.
Minimize losses from water-related issues. Boost production line efficiency. Prevent water quality from adversely affecting your product. In other words, leave it to the experts to find your custom solution, every time
Mine sites use a lot of water and produce large quantities of wastewater. Thanks to Durpro, find out how to reduce tailing ponds water volume while generating a return on investment in accordance with sustainable development.
Our client, a power producing company using high pressure steam, called on Durpro’s expertise after receiving submissions from other bidders. The company wanted our advice on the replacement of old split bed demineralizers.
Carried out for a world leader in dental pharmaceuticals, this project was interesting due to its very unique design requirements.
Our client, a large food company, asked us to design a custom-made reverse osmosis system. The aim of water purification was basically to be able to use reclaimed water to feed boilers or to cool components instead of relying on the municipal water treatment system…